Westmead Public Hospital Skyra & Prisma MRI

[one_half last=”no” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””][fusion_text]On Constructions was approached by the WSLHD to tender for the opportunity to complete a build that included 2 x MRI installations.

This was a sensitive project as it was completed whilst the imaging department of the hospital remained open and operational. The construction site was also located near sensitive sites that included the emergency department, active ambulance, helipad and 2 x linac bunkers.

Coordination was an important aspect of this job as there was a strict timeline. The team at On Constructions successfully delivered the project within the time frames.

In a timely manner On Constructions engaged with the many stakeholders in a collaborative way to ensure the project was delivered “On time and On budget.”

 

[/fusion_text][/one_half][one_half last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””][images picture_size=”auto” hover_type=”none” autoplay=”yes” columns=”1″ column_spacing=”0″ scroll_items=”” show_nav=”yes” mouse_scroll=”no” border=”yes” lightbox=”yes” class=”” id=””][image link=”” linktarget=”_self” image=”https://onconstructions.com.au/wp-content/uploads/IMG_4987.jpg” alt=””][image link=”” linktarget=”_self” image=”https://onconstructions.com.au/wp-content/uploads/IMG_4997-1.jpg” alt=””][image link=”” linktarget=”_self” image=”https://onconstructions.com.au/wp-content/uploads/IMG_4992.jpg” alt=””][/images][fusion_text]Client: Western Sydney Local Health District

Time Frame: 6 Months[/fusion_text][/one_half]

Leave a Reply

Your email address will not be published. Required fields are marked *