On Constructions inspected the empty shell space within the Lower Ground Floor at Chris O’Brien Life House for the location of the proposed new GE Signa 3T MRi Machine for installation. Throughout the inspection & establishing the required Scope of Works for the new Design & Construct Project, On Constructions was successful appointed the project award by Sydney Local Health District.

Throughout the design & construction phase, On Construction coordinated numerous trades in order to meet all required compliance deliverables for the space.

Specialised trade contractors where engaged to facilitate the brand new build & delivery of the GE Signa MRi machine. The project was handed over to the client compliant & signed off by authorising bodies for occupancy and use of the scanning unit.

Client: Sydney Local Health District – Chris O’Brien Life House

Time Frame: 24 Weeks

Back home